<iframe src="//www.googletagmanager.com/ns.html?id=GTM-K2VJGK" height="0" width="0" style="display:none;visibility:hidden">

KSB Canada Blog

Case Study: KSB overhauls obsolete pump using reverse engineered parts

A 50 year old pulp & paper mill in Northern Ontario relied on obsolete multistage pumps as mission-critical equipment.  The day the two primary pumps went down and they found out neither of their standby pumps were operational was an operator’s worst nightmare.

Read More

Topics: Case Study, SupremeServ

contact us button
preventive maintenance checklist

Search the Blog

    Recent Posts